皇冠现金网
热门标签

哈希牛牛:Fukushima debris removal delayed by another year

时间:1个月前   阅读:12

哈希牛牛www.hx198.vip)采用波场区块链高度哈希值作为统计数据,游戏数据开源、公平、无任何作弊可能性,开放单双哈希、幸运哈希、哈希定位胆、哈希牛牛等游戏。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

欧博官方网站登录www.aLLbet8.vip)是欧博集团的官方网站。欧博官方网站登录开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:新二皇冠最新手机登录(www.99cx.vip):Bursa rises cautiously ahead of Jackson Hole meet

下一篇:皇冠怎么注册用户:Aaron-Wooi Yik storm into World Championships final

网友评论